Diagnostics

For planners who get it.

Diagnostics

For planners who get it.

Nothing is more dynamic than hospitals. They grow and change. They need additional capacities. Conventional construction makes it hard for you to keep pace. Cadolto Modular Construction is the solution. And it's the fastest treatment when there is an acute need for MRI or CT equipment. Complex processes? They are our favourite challenge. Furthermore, we provide you with everything from a single source so that every step from planning to installation is as seamless as possible. regardless of the manufacturer and in turnkey condition. All at one fixed price.

We know that

time is a crucial factor in the healthcare sector. This is why it takes no more than 14 weeks for an MRI building to go from the start of planning to the first time the equipment is used. The factor of space is just as important. The smallest unit of our MRI and CT buildings requires only 65 m² and fits into one module.

And while we’re on the subject of small formats,

to minimise disturbances to hospital operations, we deliver your finished building within the space of only one day, with no noise pollution from long construction periods on site. That even includes RF shielding and air conditioning.

 

References (buildings up to 150 m²) – “basic version”:

2015 Building for the German Armed Forces with Siemens Trio 3T

2015 Building for Ibbenbüren Hospital with Siemens Aera 1.5T

2015 Building for the Central Institute of Mental Health in Mannheim with Trio 3T

2014 Building for a Moscow hospital for Siemens Aera 1.5T

 

References in clinic construction (complex systems and hospital buildings):

2015 Aachen – Buildings with Siemens Trio 3T and Aera 1.5T

2015 Kirkenes – outpatient clinic with radiology department

2013 Essen – research building at University Hospital Essen

2013 Göttingen – MRI building at University Hospital Göttingen

Top